# Oregon Department of Transportation

Type: Company

Source: GetYourBrief — https://getyourbrief.com/entity/oregon-department-of-transportation
Canonical HTML page: https://getyourbrief.com/entity/oregon-department-of-transportation

## Timeline

- **2028-06-01**: Target Construction Start — Official goal for breaking ground on the new bridge spans and light rail extension.
- **2028**: Construction Start — Target date for breaking ground on the new bridge spans.
- **2026-03-18**: Cost Surge Reported — New estimates show project costs soaring, prompting a re-evaluation of the funding plan.
- **2026-03**: Cost Escalation — Official reports indicate project costs have significantly increased.
- **2024**: Environmental Review — Publication of the Supplemental Environmental Impact Statement (SEIS).
- **2023-12-15**: Federal Funding Secured — The project receives a $600M federal Mega grant, the largest in the program's history at the time.
- **2019-11-01**: IBR Program Launch — WA and OR governors sign a memorandum of intent to restart the bridge replacement process.
- **2019**: Program Restart — Washington and Oregon governors signed an agreement to restart the replacement process.
- **2013-07-01**: CRC Failure — The previous Columbia River Crossing project is cancelled after funding disputes.
- **2013**: CRC Project Collapse — The previous Columbia River Crossing project was cancelled due to funding disputes.

## Recent coverage (2 stories, network-wide)

### I-5 Bridge Costs Soar as WA and OR Target 2028 Construction Start
2026-03-18 13:15:52 · Sector: supply · Sentiment: Negative · Impact: 6/10 · Sources: 2

The Interstate Bridge Replacement program faces significant cost escalations as Washington and Oregon officials commit to a 2028 construction timeline. This critical West Coast freight bottleneck requires urgent modernization to prevent long-term supply chain disruptions.
Full story: https://getsupplybrief.com/story/i5-bridge-replacement-costs-soar-2028-logistics

### I-5 Bridge Replacement Costs Surge as WA and OR Target 2028 Groundbreaking
2026-03-18 13:12:26 · Sector: proptech · Sentiment: Negative · Impact: 6/10 · Sources: 2

The Interstate Bridge Replacement (IBR) program has seen its projected costs escalate significantly, creating a new funding gap for Washington and Oregon. Despite the financial headwinds, both states are doubling down on a 2028 construction start date to modernize the critical West Coast logistics corridor.
Full story: https://getproptechbrief.com/story/i5-bridge-replacement-cost-surge-2028-construction

---
This page is a machine-readable summary. Sentiment measures the directional read of each development for this entity, not the tone of the reporting; impact weights consequence, not syndication reach. See https://getyourbrief.com/guides/methodology for the full editorial methodology.