Cross-Sector entity

Revolution Wind

Company
7

renewable-energy is the sole category represented across all 1 tracked stories. Revolution Wind is most often covered alongside Andrea Joy Campbell, which appears in 1 of these 1 story. Revolution Wind appears in 1 tracked Cross-Sector story from March 15, 2026.

1 verified story tracked

Last mentioned: Mar 15, 2026

Entity pulse

Recent coverage · Revolution Wind

1 story
7 avg impact
100% positive
0% negative

Coverage balance Positive coverage leads. Positive coverage exceeds negative coverage by 100 percentage points.

  • 100% positive

Figures are computed live from our source-verified story record — see our methodology for how impact and sentiment are derived.

What the coverage shows about Revolution Wind

renewable-energy is the sole category represented across all 1 tracked stories. Revolution Wind is most often covered alongside Andrea Joy Campbell, which appears in 1 of these 1 story. Revolution Wind appears in 1 tracked Cross-Sector story from March 15, 2026. The tracked stories average 3 original sources each.

Stories tracked
1
Sources per story
3

Computed from the 1 stories linked to this entity. Beat comparisons are omitted because no baseline was available for this window.

Coverage cohort

Appears alongside

Other entities that clear the same relevance threshold in stories also covering Revolution Wind. Shared-story counts are live from our verified record — not editorial picks.

Timeline

  1. Construction Completed

    Final blades are installed, marking the end of offshore construction.

  2. Blade Failure

    A GE Vernova blade breaks, scattering fiberglass on Nantucket beaches.

  3. Biden Approval

    The Biden administration signs off on the project, and onshore construction begins.

  4. Federal Delay

    The Trump administration holds off on issuing a key environmental impact statement.

  5. Project Submission

    Vineyard Wind submits state and federal plans for the offshore wind farm.

Stories mentioning Revolution Wind 1

Climate renewable energy Positive 7

Vineyard Wind Completes Construction Amid Political and Legal Headwinds

Vineyard Wind, the first major U.S. offshore wind farm, has completed construction of its 62-turbine array despite repeated attempts by the Trump administration to halt the project. The 800-megawatt facility is now fully installed, marking a significant milestone for Massachusetts' clean energy goals and the broader domestic offshore wind industry.

3 sources

Source: Jennifer McDermott (au) · The Associated Press (us)