# Ricardo Roa Barragán

Type: Person

Source: GetYourBrief — https://getyourbrief.com/entity/ricardo-roa-barragn
Canonical HTML page: https://getyourbrief.com/entity/ricardo-roa-barragn

## Timeline

- **2026-03-17**: Meta Nuclear Deal — Oklo executes 1.2 GW power campus agreement with Meta for Ohio deployment.
- **2026-01-15**: Oklo Capital Infusion — Oklo raises $1.182 billion net of fees through an ATM program.
- **2025-12-31**: Renewable Target Surpassed — Ecopetrol hits 951 MW of renewable capacity, beating its 2030 goal five years early.
- **2025-08-13**: Ecopetrol Production Peak — Reports 751,000 boed, the highest production level in a decade.

## Recent coverage (1 stories, network-wide)

### Energy Giants Pivot: Ecopetrol Hits Renewables Milestone as Oklo Secures Meta
2026-03-19 00:17:53 · Sector: climate · Sentiment: Positive · Impact: 6/10 · Sources: 6

Ecopetrol has surpassed its 2030 renewable energy targets five years early, while advanced nuclear firm Oklo secured a massive 1.2 GW development agreement with Meta. These developments signal a dual-track acceleration in the energy transition, combining traditional hydrocarbon efficiency with aggressive low-carbon scaling.
Full story: https://getclimatebrief.com/story/ecopetrol-oklo-energy-transition-2025-analysis

---
This page is a machine-readable summary. Sentiment measures the directional read of each development for this entity, not the tone of the reporting; impact weights consequence, not syndication reach. See https://getyourbrief.com/guides/methodology for the full editorial methodology.